We were asked to strip out an old kitchen and supply & install a new commercial kitchen with natural gas units. The old kitchen cooking units had originally been installed on the right hand side of the kitchen and built around an old brick fireplace.
We suggested the new cooking line would be better placed on the opposite wall under a new extract canopy complete with a gas interlock system and incoming air through the front of the canopy grills. The old equipment was removed from the site and safely disposed of.
The end result was a success and the kitchen is now fully compliant with current regulations.
Work Undertaken
Latest Case Studies